ENGINE COOLING FLUID TEMPERATURE SENSOR Toyota Avanza
Have you ever experienced water temperature indicator toyota avanza not move or die in the down position so that you do not know whether the condition of your engine toyota avanza good or too hot.To find out if the engine coolant temperature sensor is still good or not you follow these instructions:1.IGNITION COILS OFF ASSEMBLY
2.OFF ventilation hose
3.NO OFF ventilation hose. 2
4.NO OFF throttle body bracket. 2
5.DETACH CABLE MACHINE
6.DETACH PIPE RADIATOR NO. 1 SUB-ASSEMBLY
7.OFF CYLINDER HEAD COVER SUB-ASSEMBLY
8.TEMPERATURE SENSOR LIQUID COOLING OFF MACHINE
After the liquid coolant temperature sensor removable machine do the measurement using the ohmmeter which you measure the resistance between the terminals of the terminal 1-2 when the results are 2.29 to 2.60 kΩ at 20 ° C (68 ° F) and 0.302 to 0.327 kΩ at 80 ° C (80.00 ° C)
If the results are not in accordance with the specification, replace the engine coolant temperature sensor.
CAUTION:
If the coolant temperature sensor is immersed in water for inspection, make sure that water does not enter into the terminal. Upon examination, delete water from the engine coolant temperature sensor.If the condition is unknown whether the sensor is already behind you now when the tide back in the following ways:
#POST ENGINE COOLING FLUID TEMPERATURE SENSOR
Connect the temperature sensor with a new gasket.
Occasion:
20 N * m {200 kgf * cm, 14 ft lbf .*}
#POST CYLINDER HEAD COVER SUB-ASSEMBLY
Set the cylinder head cover gasket in groove head cover, and insert the gasket into the boss in the middle of head cover.
CAUTION:
Insert the gasket perfectly until contact with the ribs.
Give packing seal as shown.
Gaskets Sil:Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent
INSTRUCTIONS:
Seal packing must have a width of 5 mm and a height of 2 mm.For a while pairs of cylinder head cover with 11 bolts and 2 nuts.Tighten bolts and nuts in several stages as shown in FIG.
Occasion:
12 N * m {122 kgf * cm, 9 ft lbf .*} to bolt
9.0 N * m {92 kgf * cm, 80 in lbf .*} for the nut
#RADIATOR PIPE POST NO. 1 SUB-ASSEMBLY
#POST CABLE MACHINE
#POST NO throttle body bracket. 2
#POST NO ventilation hose. 2
#CONNECT ventilation hose
#POST ASSEMBLY ignition coils
All New Avanza & The All New Avanza Veloz
0 komentar:
Post a Comment
please comment for an article on a blog entry http://toyotavanza.com. everything abaout avanzaku